BizTalk Server 2016: Feature Pack 2 – Scheduling...Don't Forget to Check this Box! 12. April 2018 Thomas E. Canter BizTalk / Enterprise Service Bus, Phidiax Technology (0) Not noted in the Feature Pack 1 or 2 documentation, the Start date of the schedule must be checked or the scheduled task will never run.Reference: Configure the time zone and recurrence scheduling in BizTalk Server